Check cross section and profile soil surfaces compared to rock bottom. In a soil surface (1-5) height in some point is lower than rock (2), it will be set 1 millimeter higher than rock bottom.
With the Shift-key cuts alos construct surface 11 extensions above the ground.
This function has no settings.